Dholera Master Plan Explained in Simple Terms
The Dholera Master Plan covers 920 sq km — but not every area is ready or approved. As an investor, it’s critical to understand which parts of the city are open, developing, or on hold.
Let’s break down Dholera’s master plan in simple investor-friendly terms.
ЁЯзн Dholera’s Planning Structure:
ЁЯз▒ 1. Development Phases:
-
Phase 1 (Activation Area – 22.5 sq km):
Infrastructure complete – best ROI -
Phase 2 & 3: Under pipeline post-2030
ЁЯУР 2. TP Zones (Town Planning)
The city is divided into TP1 to TP6:
-
TP2E = Fully developed
-
TP1, TP4 = Fast developing
-
TP5, TP6 = Early stage (low-cost entry)
ЁЯПЩ️ 3. Functional Zones Inside Each TP
Each TP zone includes:
-
Residential
-
Commercial
-
Industrial
-
Public utility zones
ЁЯЪз 4. Roads + Utility Grid Pattern
Square-grid planning = organized growth, easy zoning
ЁЯУМ Master Plan Summary:
| TP Zone | Infra Status | Suggested Use |
|---|---|---|
| TP2E | ✅ Infra ready | Resale, fast ROI |
| TP1 | ⚙️ Developing | Residential, rental future |
| TP4 | ⚙️ Developing | Mixed-use, warehouse |
| TP5/TP6 | ЁЯФД Early stage | Long-hold, budget entry |
ЁЯУЮ Call to Action
ЁЯУН Want the latest TP zone maps + investor guide?
ЁЯУ▓ WhatsApp “Master Plan” to 7405851025
ЁЯУй We’ll send the official map with investment hotspots.
